Reinventing Foundation Solutions at a Major Technology Facility in New Mexico

Tackling the Impossible Beneath a High-Tech Facility

Some jobs look impossible at first glance. That was the case at a major technology facility in New Mexico. The general contractor needed cased micropiles installed in the basement. The problem? Access restrictions made micropile installation nearly impossible.

One of our clients recommended they call Ram Jack New Mexico. That call changed the entire foundation design.

When Standard Solutions Won’t Work

Micropiles were originally designed to be used in this project, but the basement layout ruled them out. The vertical loads were 26 kips per pile, easily supported by 2 7/8” helical piers. The challenge came from unusually high lateral stiffness requirements. Because helical piers are slender foundation elements with limited lateral and bending strength, the engineering team designed a custom solution to deliver the required foundation support.

An Idea That Changed the Project

Our engineering team asked a bold question: What if we could stiffen the entire pier, not just the top? The answer was a new double-wall helical pier design.

Through collaboration between project managers, in-house engineers, third-party engineers, and Ram Jack Distribution, we designed and executed a custom solution. The system used 3 ½” Threaded Connection helical piers overcased from top to bottom with 4 ½” casing, creating a highly reinforced foundation system capable of meeting both vertical and lateral demands. Our mechanic played a critical role by fabricating specialized installation tools and retrofitting an electric powered mini-excavator, and torque head to ensure safe and precise installation of these complex, design-build piers value engineered specifically for this project.

Design-Build Innovation with Custom Components

This was not an off-the-shelf solution. It was design-build engineering tailored for a unique site. Ram Jack New Mexico partnered with Ram Jack Distribution to fabricate a specialized combination of pier components to meet engineer’s specifications:

  • 8/10 double helix 5-foot starters with welded casing.
  • Custom bearing plates and brackets.
  • 4.5” threaded casing extensions.
  • Temporary thread sleeves for protection during manufacturing and installation.

This design-build approach ensured the system performed under strict structural requirements while meeting safety and durability standards.

Straight Line Construction crew installing helical piers for foundation repair in New Mexico
Straight Line Construction crew installing helical piers for foundation repair in New Mexico

Installing Piers in Tight, Demanding Conditions

The project site presented exceptionally challenging conditions, including confined basement spaces, deep hydro-excavated shafts, and limited access for equipment. Our team navigated these obstacles with precision, using an electric mini-excavator to maneuver in tight spaces. Torque head power was supplied through an exterior hydraulic power pack connected by hundreds of feet of hose suspended from the ceiling. Team members maintained strict safety protocols for the site even wearing fall protection harnesses when working around the deep excavation shafts.

Because the engineered design required the piers to be installed at a battered angle (tilted rather than vertical), the installation head was stabilized and continuously monitored to ensure proper alignment. Each pier was advanced at the specified angle with precise control and careful coordination. Despite the demanding environment, Ram Jack New Mexico’s crew executed flawlessly, demonstrating extraordinary skill, teamwork, and ingenuity. Their expertise ensured the complex, design-build helical piers were installed safely, accurately, and ahead of schedule, exemplifying the company’s leadership in innovative foundation solutions.

Safety, Skill, and Teamwork

This project demanded creativity from start to finish. Our crew retrofitted equipment, fabricated tools, and adapted to extreme site restrictions, all while meeting the strict safety demands of the facility. With a total of 20 piers installed, foremen Pablo and Wesley led safe, efficient work inside confined spaces. Every detail reflected our team’s commitment to safety and precision.

Thanks to coordination with the GC, site superintendent, design engineer, Ram Jack Distribution and the dedication of our crew, Ram Jack New Mexico finished ahead of schedule.

A New Future for Helical Piers

At Ram Jack New Mexico, this project was more than an installation — it was a reinvention of foundation design. By engineering and executing a custom double-wall helical pier system, our team demonstrated that helical technology can meet not only vertical demands but also the most stringent lateral stiffness requirements. 

What began as an “impossible” basement installation became a proven model for future projects across the region. 

With collaboration, ingenuity, and precision execution, Ram Jack New Mexico continues to push the limits of what’s possible in foundation support — delivering safe, innovative, and value-engineered solutions for today’s most complex construction challenges.

Straight Line Construction crew installing helical piers for foundation repair in New Mexico
Ram Jack New Mexico crew installing helical piers for foundation repair in New Mexico
Piers located in the basement of a technology company ram jack new mexico fixed their foundation

More Posts

Straight Line Construction

Straight Line Construction has changed a great deal over the last 30+ years in the industry, but one thing remains the same: our commitment to quality and to designing and installing permanent solutions to foundation settlement issues. Beginning with small residential jobs more than 30 years ago when the family-owned company was founded by Tim Davis, Sr., Straight Line Construction today repairs cracking residential and commercial foundations through its Ram Jack product toolkit and designs solutions for large infrastructure and industrial projects. We specialize in matching the right solution to each type of foundation repair issue.

Are you building a new home and want to ensure it has a solid foundation? Or is your house experiencing unwanted sagging or a cracking foundation? Are your walls cracked or your doors and windows sticking? As a bonded, licensed, and fully insured foundation repair company, we are proud to serve Colorado homeowners, builders, and commercial contractors. Our technical certifications enable us to offer the highest quality services and the best American-made, environmentally safe products available for foundation repair. Regardless of how your building is shifting or sinking, we can help you stop it. Our 30 years in the business and our designation as a Ram Jack certified dealer means you get the most technologically savvy solution to fix your foundation.

From the factory to the field, we strive to ensure the quality of our products and workmanship meet the highest industry standards. We work with other vetted professionals in the industry. All of our helical piers, push piers, and mounting brackets are manufactured by Ram Jack in Ada, OK, at an ISO-certified facility with American-made steel. Williams Form Engineering in Golden, CO, manufactures our reinforcing bar for ground anchor systems and shares our commitment to quality control and quality assurance.

About Ram Jack

Ram Jack is a family-owned business that began operations in 1968, in Ada, OK, where we currently source our piers and brackets. Back then, concrete piering was the original repair method used simply because it was the only technology available at the time. Over time, it became evident that concrete piers did not provide long-term stabilization of foundations and only provided a short-term warranty period. To guarantee the highest grade of customer satisfaction, a greater solution needed to be found.

The Ram Jack owners embarked on a research program to develop a foundation repair system to stand the test of time. The U.S. Patent and Trademark Office first issued a patent to Ram Jack for its foundation repair system in 1985. Over the next few years, additional refinements and patents have followed, resulting in the strongest patented system in the industry. Ram Jack driven pilings are ICC-ES recognized (International Construction Code—Evaluation Services). Ram Jack is one of only two ICC-ES recognized foundation repair companies in the industry. Ram Jack’s products meet or exceed code requirements set down by ICC-ES for both commercial and residential properties.

Request an On-Site Evaluation

Have a question or need to speak with our commercial team?

Speak to Our Team Now

CONTACT US